Wind turbine bolted connection inspection
Back to projectsNORTHON / PROJECT

Bolted connection inspection on 16 turbines

The Northon team completed bolted connection inspections on 16 wind turbines.

Inspection scope

The inspections followed the project's technical documentation. The team checked the specified connections, documented the results and marked completed work to retain full traceability.

  • tool preparation and verification
  • inspection of specified bolted connections
  • marking and documentation of completed work
  • handover of inspection results

Safety and quality

Work on all 16 turbines was completed in accordance with the project's safety requirements and quality procedures.